Estimated reading time: 0 minutes, 19 seconds

Boeing's 787 Supply Chain Issues

An interesting blog by Geoff Beckman on the Internet Evolution site provides a breakdown of problems associated with the Boeing 787 airliner rollout. As he states, it "makes an SAP project look like a Swiss watch". I don't think he means that as a compliment.
There were some serious supply chain issues and decisions that contributed to the launch problems. Check out his story HERE. 
Read 3719 times
Rate this item
(0 votes)

Visit other PMG Sites: